About this calculator
Cycle time is how long it takes, on average, to complete one unit. This calculator finds the observed average cycle time from records: how long the process ran and how many units it completed. Compare the result with your takt time (the pace customers need) and with the machine’s ideal cycle time (its fastest possible pace) to see where time is being lost.
Formula
Average cycle time = Productive operating time ÷ Units completed
Units per hour = Units completed ÷ Operating time in hours
All times are converted to seconds before dividing. The time basis is the operating time you enter: if it includes stoppages, they are spread across every unit.
Worked example
A cell ran for 450 minutes and completed 900 good units; 950 units were produced in total.
- Operating time = 450 × 60 = 27 000 s
- Average cycle time per good unit = 27 000 ÷ 900 = 30 s → 3600 ÷ 30 = 120 good units per hour
- Average time per unit produced = 27 000 ÷ 950 = 28.42 s (126.7 units per hour)
Assumptions and limitations
- The result is an average. Individual cycles may be faster or slower.
- Use the same period for time and units. If the operating time includes breakdowns, the average includes them too — exclude them if you want the running cycle time only.
- Observed cycle time is different from ideal cycle time (used in OEE) and from takt time (available time ÷ customer demand).
References
- Standard work-measurement and lean definitions of cycle time, takt time and throughput.